These are the photos from day one of the dissection of YMCA Elmo. Basically this day consisted of removing the fuzzy fabric and documenting along the way. By the end of the day I was left with a fully functioning skeleton.
Tuesday, October 2, 2007
YMCA Elmo - Dissection Day 1
Posted by
Shannon Leah Small
at
12:47 AM
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment